The foundation parts of the cooling tower are on the same horizontal line
After the foundation of the cooling tower is mounted, please fix and lock the foundation bolts. Please reconfirm whether the foundation bolts are locked during trial operation. If there is a steel frame on the foundation, please lock the bolts of the steel frame.
Author:
The basic parts of the cooling tower are on the same horizontal line. If the basic level is a little high or low, please adjust it with filler.
For connection type and plural rooms, please confirm whether there is no gap between each room.
After the foundation of the cooling tower is mounted, please fix and lock the foundation bolts. Please reconfirm whether the foundation bolts are locked during trial operation. If there is a steel frame on the foundation, please lock the bolts of the steel frame.
When anti-vibration device is provided, confirm whether the foundation or steel frame and anti-vibration device are locked with the cooling tower, and confirm according to the assembly essentials of the anti-vibration device manual.
When connecting the pipeline, please do not deform the cooling tower body or interface due to the force caused by correcting the inclination of the pipeline. Please fix the interface at the same time when the pipeline is rotated.
Please do not install the piping above the operating water level of the cooling tower, otherwise air will be sucked in at the beginning of the operation, and overflow will be generated when the operation is stopped.
The joints connected with the cooling tower should use soft joints as much as possible, so that the pipes only vibrate themselves without affecting the cooling tower.
Please assemble valves on each pipe, so that the cooling tower can be easily cleaned, and it can also be used as an anti-freezing countermeasure when the operation is stopped. In order to make the operation convenient, please do not assemble valves under the cooling tower.
Please connect the drain and overflow to the drain pipe. Drainage must be equipped with valves, and please design for natural fall drainage. Do not install valves in overflow pipes.